View Single Post
  #2680  
Old 24th August 2016, 18:46
Paul L's Avatar
Paul L Paul L is offline
Senior Member
 
Join Date: Feb 2012
Location: Wembley, London
Posts: 5,058
Paul L is on a distinguished road
Default

Wednesday Afternoon - Part 2:
I then smoothed out the sealing compound around the edges, including the "join" piece.



By now I had to remove the rubber seal and hit the "join" with a hammer to get a better fit.

So, for the MOT, I have stuffed extra sealing compound into the gap like so.



But, at some point, I will add an aluminium panel across this area.

At this point I didn't have the strength to carry on, so I will re-fit the heater control panel another day.

Which means that this is where I finished off and I am very glad this job has been ticked off the list.





I can't believe what a HUGE difference it makes to the cockpit as a whole.
( And, obviously, it will look even better when I have finished. )

Until next time, take care, Paul.

PS
It is now absolutely lashing down outside.
Reply With Quote